News

[Reopened] Closure of the multi-use path on the Samuel De Champlain bridge on Monday, December 6 at 4am

[Update – December 6, 2021 12:00 p.m.] The multi-use path on the Samuel-De Champlain bridge is now reopen

[Original post] 

Signature on the St. Lawrence Group wishes to advise pedestrians and cyclists that the Samuel De Champlain Bridge Multi-Use Pathway will be closed on Monday 6 December starting at 4am.

Indeed, a weather alert is in effect in the Montreal region with snow, freezing rain and rain. The multiuse path will therefore be potentially closed for safety reasons accordingly to the operating criteria.

The multi-use path will reopen as soon as possible after our operation and maintenance teams have ensured its safe use by cyclists and pedestrians.