Photos and videos
In this section, you will find a multimedia gallery displaying informative video capsules showcasing the project, photos of the various portions of work done on the corridor, and portraits of individual workers who contributed to the project.
Photo albums
-
Cable-stayed jetty
-
East Approach (Brossard)
-
Highway 15
-
Île-des-Soeurs Bridge
-
Overall View
-
West Approach (Île-des-Sœurs)
-
Samuel De Champlain Bridge lightening
Samuel De Champlain Bridge lightening
31 pictures -
Opening of the Samuel De Champlain multi-use path – December, 23rd 2019
Opening of the Samuel De Champlain multi-use path – December, 23rd 2019
11 pictures -
New Champlain Bridge replica – Good Shepherd Elementary school (Brossard)
New Champlain Bridge replica – Good Shepherd Elementary school (Brossard)
17 pictures -
Transportation – Heavy parts delivery
Transportation – Heavy parts delivery
39 pictures -
The builders
The builders
118 pictures -
Cable-stayed jetty
Cable-stayed jetty
93 pictures -
3D render of the New Champlain Bridge
3D render of the New Champlain Bridge
9 pictures -
Overall View
Overall View
25 pictures -
West Approach (Île-des-Sœurs) – Spring 2017
West Approach (Île-des-Sœurs) – Spring 2017
17 pictures -
Lower cross beam installation
Lower cross beam installation
12 pictures
Videos
-
The Samuel De Champlain highway portion from Montreal to the South Shore
The Samuel De Champlain highway portion from Montreal to the South Shore
-
Lifting of the last box girders for the new Champlain Bridge: start of the final connection
Lifting of the last box girders for the new Champlain Bridge: start of the final connection
-
The Cable-Stayed Bridge : signature element of the new bridge
The Cable-Stayed Bridge : signature element of the new bridge
-
Overview of the new Champlain bridge worksite – November 2018
Overview of the new Champlain bridge worksite – November 2018
-
Installation du premier voussoir de la travée principale du pont à haubans
Installation du premier voussoir de la travée principale du pont à haubans
-
The logistics and transportation of prefabricated pieces to the site
The logistics and transportation of prefabricated pieces to the site
-
Piers and Pier caps : the legs of the bridge
Piers and Pier caps : the legs of the bridge
-
Installation of the bridge’s first pier cap – July 2017
Installation of the bridge’s first pier cap – July 2017
-
Two-stage lift of the upper cross beam
Two-stage lift of the upper cross beam
-
Learn more about the new Nun’s Island Bridge, the project’s second longest bridge
Learn more about the new Nun’s Island Bridge, the project’s second longest bridge
-
Among the footings of the new Champlain bridge – 360° Video
Among the footings of the new Champlain bridge – 360° Video
-
Overview of the New Champlain Bridge worksite – April 2017
Overview of the New Champlain Bridge worksite – April 2017
Curious to see the evolution of the construction of the new Champlain Bridge as the crow flies? Take a moment to view our new drone images taken last April.
An excellent overview of the work progress and a good way to see the colossal work carried out by our teams in the last months! You will be able to see the three main working platforms, the East Approach, the West Approach and finally the Cable-Stay Bridge. Ready for takeoff?