Photos and videos
Photo album East Approach Design (Brossard)
Credit : Infrastructure Canada
Watch the design for the approach from the east to the new bridge for the St. Lawrence.
Credit : Infrastructure Canada
Watch the design for the approach from the east to the new bridge for the St. Lawrence.
Planned closures of the multipurpose path: May 4 to 7, from 8:00 p.m. to 5:00 a.m.
More about