News

Roadwork planned for January 27-30, 2017

Signature on the Saint-Lawrence wishes to inform road users that, as part of the construction work for the new Champlain Bridge, a series of disruptions is planned over the coming days.

 

Friday, January 27

Île-des-Soeurs Sector

  • PJCCI / Actual Champlain Bridge – Complete closure of the René-Lévesque Boulevard South from 6am to 2pm. Closure of the right or left lane outside of this schedule.

Saturday, January 28

Île-des-Soeurs Sector

  • PJCCI / Actual Champlain Bridge – Complete closure of the René-Lévesque Boulevard South from 6am to 2pm. Closure of the right or left lane outside of this schedule.

 

Sunday, January 29

Île-des-Soeurs Sector

  • PJCCI / Actual Champlain Bridge – Complete closure of the René-Lévesque Boulevard South from 6am to 2pm. Closure of the right or left lane outside of this schedule.

Monday, January 30

Île-des-Soeurs Sector

  • PJCCI / Actual Champlain Bridge – Complete closure of the René-Lévesque Boulevard South from 6am to 2pm. Closure of the right or left lane outside of this schedule.

Atwater Sector

  • Closure of the right lane on the Atwater South boulevard under the A15 from January 30 to February 13

Drivers are encouraged to check our website and to follow us on Twitter @nouv_champlain for the latest information on the traffic disruptions.

We also strongly urge drivers to check the MTQ website www.quebec511.info before setting out or to follow the MTQ on Twitter @Qc511_Mtl for information on all disruptions in the Greater Montreal road network.

Public transit users can visit the STM website to see the impact on their route and bus stops.