News

Closing of the Multi-Use Pathway and the La Riveraine pathway on September 21 (5 p.m. to 6 a.m.) and September 22 (7 p.m. to 6 a.m.)

Signature sur le Saint-Laurent Construction (SSLC) wishes to advise pedestrians and cyclists that the multi-use pathway on the Samuel-De Champlain Bridge and the La Riveraine pathway will be closed on September 21 from 5 p.m. to 6 a.m. and on September 22 from 7 p.m. to 6 a.m.

During this period, our crews must perform finishing and corrective work including paving and work on the shoulders in the Brossard sector.

* Dates subject to change. In the event of adverse weather conditions or operational constraints, closures may be cancelled or modified.